Innovation Strategy
LEAN
RAAS
Project Overview
About the project
Meet the team
Project docs
Strategic Innovation Fund (SIF)
Funding Review
Meet The Team
LEO-N
FastTrack
3D AR
Dynamic Networks
Ilad
Maxflex
Rides
VIVID
Contact Us
Innovation Proposal
MERLIN
NINES
NIA Projects
How we Innovate
Library
Innovation Benefits
TRANSITION
Project LEO
Working together to make innovation happen
Submit an innovation proposal
Thursday 24th April 2025
Project overview
About the project
Meet the team
Commercial Framework
Project docs
Project Documentation
Select a Category
All
Milestone Deliverable
Project Deliverable
Project Progress Report
RaaS Work Packages & Project Deliverables
Download
PD1 – Site Selection & Front End Engineering Design
Publication date:
Feb 2021
Download
PD1 – Site Selection Report
Publication date:
Feb 2021
Download
PD1 – Front End Engineering Design (FEED) Report
Publication date:
Feb 2021
Download
PD2 – Detailed Design
Publication date:
Nov 2021
Download
PD3 – Business Model
Publication date:
Jan 2022
Download
PD4 – Stakeholder Engagement & Stage Gate Decision
Publication date:
Feb 2022
Download
PD5 – Supply Chain Engagement – Commercial Framework
Publication date:
Jul 2024
Download
WP2 – Site Selection (E2a.1)
Publication date:
Feb 2021
Download
WP2 – FEED (E2a.2)
Publication date:
Feb 2021
Download
WP3 – RaaS Sites Review and Technical Modelling Requirements
Publication date:
Feb 2021
Download
WP3 – PoW Switching Study – Drynoch
Publication date:
May 2021
Download
WP3 – Network Model Development and Validation for RaaS Feasibility Studies
Publication date:
Oct 2021
Download
WP3 – Modelling and Simulation Studies of Inrush Current Phenomena
Publication date:
Jul 2021
Download
WP3 – Evaluation of Islanded Network Black Start Capability – RaaS Scheme
Publication date:
Oct 2021
Download
WP3 – Protection Coordination Studies
Publication date:
Nov 2021
Download
WP3 – DNO Controller Requirements Specification
Publication date:
May 2021
Download
WP3 – DNO Controller Detailed Design Specification
Publication date:
Jun 2021
Download
WP3 – DNO Controller Testing, Installation And Commissioning Plan
Publication date:
Jul 2021
Download
WP3 – DNO Controller Summary Report
Publication date:
Aug 2021
Download
WP3 – RFP document (E3a.3)
Publication date:
Aug 2021
Download
WP3 – Detailed Design for RaaS BESS & EMS (E3a.4)
Publication date:
Oct 2021
Download
WP4 – Flexibility Scenarios (E4.1)
Publication date:
Nov 2020
Download
WP4 – Flexibility Optimisation for RaaS Battery Operation (E4.2_E4.3)
Publication date:
Aug 2021
Download
WP5 – DNO Business Case Review
Publication date:
Oct 2021
Download
WP5 – Modelling Methodology (E5.1)
Publication date:
Nov 2020
Download
WP5 – Investor Risk Evaluation (E5.2)
Publication date:
May 2021
Download
WP5 – Investor Business Case (E5.3)
Publication date:
Jan 2022
Download
WP5 – Heads of Terms – Supporting Information (E5.4)
Publication date:
Jan 2022
Download
WP6 – Investigation into the Wider Potential of RaaS (C6.1)
Publication date:
Nov 2021
Download
WP6 – Risk Evaluation for RaaS Roles (C6.2)
Publication date:
Aug 2021
Download
Project Progress Report 2020
Publication date:
Dec 2020
Download
Project Progress Report 2021
Publication date:
Dec 2021
Download
Project Progress Report 2022
Publication date:
Dec 2022
Download
Project Progress Report 2023
Publication date:
Dec 2023
Download
Project Progress Report 2024
Publication date:
Dec 2024
Download
RaaS Stage Gate Stakeholder Engagement – Overview
Publication date:
Nov 2021
Download
RaaS – Energy Innovation Summit Nov 2023
Publication date:
Nov 2023
Download