NIA SSEPD 0010 Mobile Generation Re-Sync at 11kV and 33kV

Key Activities

A mobile, trailer mounted Circuit Breaker (CB) has been developed and trialled in SSEN under a previous IFI project which has successfully proven the concept, but the methodology needs further development to ensure that it is fit for purpose. This project will develop a technical methodology utilising the installation of a 33kV pole mounted CB using live line techniques which can be used at all distribution voltages from 11kV to 33kV on poles with Air Break Switches.

Expected Outcomes

Determine the technical and operational viability of the proposed methodology. Quantify the savings in CIs and CMLs which could be saved by the use of this technique. Determine the commercial viability of applying this methodology across the SSEN license areas.

Funding

£120,000

Start/End Date

June 2015 – April 2017

NIA Project Registration and PEA Document – NIA SSEPD 0010 Mobile Generation Re-Sync at 11kV and 33kV
NIA Project Registration and PEA Document – NIA SSEPD 0010 Mobile Generation Re-Sync at 11kV and 33kV
AuthorColin Mathieson
Publication dateJune 2015
Download
NIA Project Progress Report 2016 – NIA SSEPD 0010 Mobile Generation Re-Sync at 11kV and 33kV
NIA Project Progress Report 2016 – NIA SSEPD 0010 Mobile Generation Re-Sync at 11kV and 33kV
AuthorColin Mathieson
Publication dateJuly 2016
Download
NIA Project Closedown Report – NIA SSEPD 0010 Mobile Generation Re-Sync at 11kV and 33kV
NIA Project Closedown Report – NIA SSEPD 0010 Mobile Generation Re-Sync at 11kV and 33kV
AuthorColin Mathieson
Publication dateJuly 2017