Key activities

The project aims to identify innovative cable installation methods that can reduce the cost of cable installation and increase the length of cables that can be installed without having joints.

Expected outcomes

The project will be considered a success if it determines whether or not there are innovative methods for cable installation that have the potential to reduce costs and, or install long sections of cable without joints.

Funding

NIA £225,000

Start/end date

2015 – 2017